Appendix E.5

 

 

 

 

 

 

 

 

 

 

 

 

 

Brighton Seafront Regeneration Limited on behalf of the SohoHouse Group

 

Units 2-8 The Terraces MadeiraDrive Brighton

 

 

Transport Statement June 2015

 

 

 

 

 

 

 

 

 



 

 

 

Contents

1               INTRODUCTION...................................................................................................... 1

2               EXISTING SITUATION............................................................................................ 2

Site Location............................................................................................................ 2

Local Highway Network and Parking Provision.................................................... 2

Accessibility............................................................................................................. 2

3               DEVELOPMENT PROPOSAL..................................................................................... 4

Cycle Parking........................................................................................................... 4

Servicing and Refuse.............................................................................................. 4

4               POLICY..................................................................................................................... 6

National PlanningPolicy Framework (March2012)............................................. 6

Brighton and Hove Local Plan (2005).................................................................... 6

Proposed Submission City Plan (February 2013)................................................. 7

5               SUMMARY AND CONCLUSION................................................................................ 9

 

 

 

Figures

 

Figure 1       -        Site LocationPlan

 

Appendices

 

Appendix A -        Existing Layout Plans AppendixB -        Bus Map

Appendix C -        Proposed Layout Plans

 

Appendix D -        Existing and Proposed Floor Areas

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

i


 

 

1                     INTRODUCTION

 

1.1                             TTP Consulting is retained by Brighton Seafront Regeneration Limited on behalf of the Soho House Group to provide transport advice in relation to their proposals for the Units 2-8 The Terraces,Madeira Drive site (“the site”), in Brighton.The site locationis indicated at Figure 1.

 

1.2                             The site is currently in bar/restaurant (A3) and amusement arcade use and it is proposed to refurbish and extend the existing bar and restaurant units, including the provision of a membersclub area and to remove the amusement arcade.

 

1.3                             Soho House opened its first Members Club in London in 1995 and this site would become the 15th in the network.

 

1.4                             The report concludes that the proposeddevelopment will not realise any material transportation impact in comparison to the existing use of the site.

 

1.5                             The Statement has been prepared following a site visit and the remainder of the report is set out as follows:

 

·         Section 2 sets out the existingsituation;

 

·         Section 3 sets out the development proposals;

 

·         Section 4 sets out relevant transportpolicies; and

 

·         Section 5 summarises and concludes.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Transport Statement: Soho House,Brighton – Report Author:Nick Bond (nbond@ttp-consulting.co.uk)                                                1

P:\2013\1572 - Marine ParadeBrighton\Word\R01-NB-TS (150610).docx

June 2015


 

2                     EXISTING SITUATION

 

Site Location

 

2.1                             The site is located between Marine Parade and Madeira Drive, above the Brighton Sea Life Centre.

 

2.2                             The site contains a number of separate bar/restaurant units and an amusement arcade.

 

2.3                             The listed pavilion provides a service lift allowing for goods to be readily transferred from street level and also includes a shared refuse area, a further refuse storage area is also availableat the eastern end of the site. The existinglayout plans are at Appendix A.

 

2.4                             The site location with respect to the local highway networkis shown at Figure 1.

 

Local Highway Network and Parking Provision

 

2.5                             The site is fronted by Madeira Drive at ground floor level and by Marine Drive at upper tier level.

 

2.6                             Parking close to the site is generally pay and display, with controls in place every day from 09:00 to 20:00. Chargesare £3.00 for 1 hour, £5.00 for 2 hours, £10.00 for 4 hours and

£15.00 for up to £11.00.Motorcycle and cycle parking is also availablein close proximity to the site.

 

2.7                             Servicing bays are providedon the site frontage to Madeira Driveand double yellowlines allow for servicing on the site frontage at upper tier level to Marine Drive. A 30 metre long loadingbay is on Madeira Drive adjacent to Unit 2 and a 20 metre loading bay adjacent to Unit 8.

 

Accessibility

 

2.8                             The site is on the edge of Brighton City Centre and is within walking distance of a number of hotels, other bars and restaurants, a significant residential catchment area and is also close to numerousbus services and Brighton Rail Station. The busmap for the area is at Appendix B.

 

2.9                             Brighton Station provides regular services to a range of destinations including Gatwick Airport, London Bridge,London Victoria, Hove, Worthing, Chichester, Southhampton, Lewes, Eastbourne and Hastings.

 

 

Transport Statement: Soho House,Brighton – Report Author:Nick Bond (nbond@ttp-consulting.co.uk)                                                2

P:\2013\1572 - Marine ParadeBrighton\Word\R01-NB-TS (150610).docx

June 2015


2.10                         The site is thereforelocated in a highly accessible area and so the vast majority of staff and customers wouldbe expected to walk or use public transport to access the site.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Transport Statement: Soho House,Brighton – ReportAuthor: Nick Bond (nbond@ttp-consulting.co.uk)                                               3

P:\2013\1572 - Marine ParadeBrighton\Word\R01-NB-TS (150610).docx

June 2015


 

 

3                     DEVELOPMENT PROPOSAL

 

3.1                             It is proposed to refurbish and extend the current units, to give a total floor area of 3,210sqm of bar/restaurant and members club use. The proposed layout plans are at Appendix C.

 

3.2                             This will include 4 restaurant/café units (1,410sqm) and a members club (1,800sqm) which includes a fish bar, gym, games room, drawing room, bar/pool lounge and changing area. Outdoor seating areas will also be provided. The plans at Appendix D give a breakdown of the floor areas.

 

3.3                             A service/back of house access corridor links kitchen and storage areas with access to the pavilion service lift.

3.4                             The restaurant/café units are expected to have a total customer capacity of the order of 430, comprising 80 open air seating and 350 seated/takeaway customers. Up to an additional 430 people could be accommodated in the membersarea, 260 in outside seatingand 170 internally.

3.5                             This gives a total customer capacity of 860. It is expected that a total of 120 full and part time staff will be employed, with at most 60 of these on site at any one time.

3.6                             Opening hours are expected to be from 08:00 to 01:00 Monday to Thursday, 08:00 to 03:00 Friday and Saturdayand 08:00 to 24:00 on Sundays.

 

Cycle Parking

 

3.7                             A cycle store area will be providedfor staff.

 

Servicing and Refuse

 

3.8                             The entire site will be operatedand managed by Soho House, offering certain efficiencies in servicing and refuse operations and management over theuse of the site by separate tenants.

Servicing

 

3.9                             A shared back of houseaccess ensures that food deliveriescan be combined, drinks deliveries will also be coordinated where possible.

3.10                         It is expected that typically between5 and 8 deliveries will take place per day, ranging from transit vans up to a 7.5 tonne truck for drinks deliveries. The majority of deliveries will take

 

 

 

Transport Statement: Soho House,Brighton – Report Author:Nick Bond (nbond@ttp-consulting.co.uk)                                                4

P:\2013\1572 - Marine ParadeBrighton\Word\R01-NB-TS (150610).docx

June 2015


 

 

place between 08:00 and 11:00 and will be planned to avoid more than 1 vehicleturning up at the same time.

Refuse and Recycling

 

3.11                         A centralised waste room will be provided, with waste and recycling transferred from each unit to this area asrequired.

3.12                         A cardboard compactor and glasscompactor will be used to reduce the volume of waste, again offering benefits over the occupation of the site by separate tenants. A lift allows for ready access to street level.

3.13                         It is expected that a private waste contractor will be used (likely to be Veolia) with waste collection likely to take place between 08:00 and 10:00 on weekdays and 09:00 to 11:00 on weekends.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Transport Statement: Soho House,Brighton – Report Author:Nick Bond (nbond@ttp-consulting.co.uk)                                                5

P:\2013\1572 - Marine ParadeBrighton\Word\R01-NB-TS (150610).docx

June 2015


 

4                     POLICY

 

4.1                             This sectionsummarises the relevanttransport policies at national, regionaland local level and these are considered in the context of the development of the site and how it complies with those policies.

 

National PlanningPolicy Framework (March2012)

 

4.2                             Paragraph 32 sets out that:

 

“All developments that generate significant amounts of movement should be supported by a Transport Statement or Transport Assessment. Plans and decisions should take account of whether:

 

·         the opportunities for sustainable transport modes have been taken up depending on the nature and location of the site, to reduce the need for major transport infrastructure;

 

·         safe and suitableaccess to the site can be achieved for all people; and

 

·         improvements can be undertaken within the transport networkthat cost effectively limit the significant impacts of the development. Development should only be prevented or refused on transport grounds where the residual cumulative impacts of development are severe.”

 

4.3                             The site has good accessibility to rail and bus servicesand is located close to a largeresidential catchment, hotels and other bars and restaurants, which will ensure that patternsof travel to the site will be sustainable.

Brighton and Hove Local Plan (2005)

 

4.4                             Adopted on the 21 July 2005, the Local Plan aims to improve travel to and within Brighton and Hove. It seeks to limit traffic growth to enable a free flowing network. The Council promotes forms of transport that are less damaging to the environment with lower levels of air and noisepollution.

 

4.5                             The transport policies in the Local Plan have been saved until the adoption of the Local Development FrameworkDocuments.

 

 

 

Transport Statement: Soho House,Brighton – Report Author:Nick Bond (nbond@ttp-consulting.co.uk)                                                6

P:\2013\1572 - Marine ParadeBrighton\Word\R01-NB-TS (150610).docx

June 2015


 

 

4.6                             The following policies complement the proposals in the Local Transport Plan and are relevant to the proposed development.

 

4.7                             Policy TR1 states ‘Development proposals should provide for the demand for travel they create and maximisethe use of public transport, walking and cycling.’

 

4.8                             The additional floorspace is likely to attract little in the way of new trips over and above the existing consented uses on site as the vast majority of customers and members will already be utilising existing restaurant and evening entertainment facilities in the surrounding area and will transfer theirtrade from these existing venues.

 

4.9                             Policy TR7 promotes safe development stating ‘Planning permission will be granted for developments that do not increase the danger to users of adjacent pavements, cycle routes and roads.’

 

4.10                         The layout of the site providesfor good pedestrian access to the lower tier of the development via the terraces, which will act to disperse pedestrian movement between several routesto Madeira Drive and Marine Parade.

 

4.11                         Policy TR14 states: ‘In all proposals for new development and changes of use, applicants shouldprovide facilities for cyclists in accordance with the parkingguidance.’

 

4.12                         Supplementary Planning Guidance Note 4 [SPG4] ‘Parking Standards’ indicates a cycle parking standard of 1 space per 300sqm. Cycle parking is available on-street to cater for customers and it is proposed to provide 12 secure spaces within the site to allow for staff cycle parking.

 

Proposed Submission City Plan (February2013)

 

4.13                         Within CP9 Sustainable Transport it is set out that the Council will ensure the priorities of the TransportStrategy are deliveredwithin the city by ‘Directing significant development into areas with good sustainable transport links’ and ‘By informing and influencing journey patterns, promoting and encouraging the use of more sustainable transport options, andproviding measures that increase people’s travel options, the council and city can help tackle climate changeand reduce carbonemissions’.

4.14                         The accessibility of the site ensures that the proposeddevelopment is in line with this policy.

 

 

 

 

Transport Statement: Soho House,Brighton – Report Author:Nick Bond (nbond@ttp-consulting.co.uk)                                                7

P:\2013\1572 - Marine ParadeBrighton\Word\R01-NB-TS (150610).docx

June 2015


Section Summary

4.15                         This sectionhas shown that the proposedscheme is consistent with national and local transport policy guidance.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Transport Statement: Soho House,Brighton – ReportAuthor: Nick Bond (nbond@ttp-consulting.co.uk)                                               8

P:\2013\1572 - Marine ParadeBrighton\Word\R01-NB-TS (150610).docx

June 2015


 

 

5                     SUMMARY AND CONCLUSION Summary

5.1                             Brighton SeafrontRegeneration Limited along with The Soho House Group proposes to refurbish and extend the bar and restaurant units located adjacent to the Brighton Sea Life Centre to provide restaurants, bars and a members club with a total customercapacity of up to 860. It is expected that a total of 120 staff will be employed.

 

5.2                             It is proposed to refurbish and extend the current units, to give a total floor area of 3,210sqm of bar/restaurant and members club use. This will include 4 restaurant/café units (1,410sqm) and a members club (1,800sqm) which includes a fish bar, gym, games room, drawing room, bar/pool lounge and changing area. Outdoor seatingareas will also be provided.

 

5.3                             Opening hours are expected to be from 08:00 to 01:00 Monday to Thursday, 08:00 to 03:00 Friday and Saturdayand 08:00 to 24:00 on Sundays.

 

5.4                             Though several different restaurants will be offered and a bar and a members club are to be provided, these will all be managed by Soho House, offering certain efficiencies in servicing and refuse management over the use of the site by separate tenants and so it is not expected that the proposals will give rise to any additional service vehicle demand in comparison to the full use of the existing site by separatetenants.

5.5                             A shared kitchen area with links to all the restaurant units ensures that food deliveries can be combined and drinks deliveries will also be coordinated.

5.6                             A centralised waste room will be provided, with waste and recycling transferred from each unit to this area as required. A cardboard compactor and glass compactor will be used to reduce the volume of waste, againoffering benefits over the occupation of the site by separate tenants. A servicelift allows for ready access to streetlevel.

5.7                             The site is in a highly accessible location so it is expected that the majority of both staff and customers will arrive on foot. The pay and display parking controls in the vicinityof the site will also help to discourage privatecar travel to the site.

 

Conclusion

 

5.8                             The proposed scheme is consistent with national and local transport policy guidance and will give rise to no transport related impacts.

 

Transport Statement: Soho House,Brighton – Report Author:Nick Bond (nbond@ttp-consulting.co.uk)                                                9

P:\2013\1572 - Marine ParadeBrighton\Word\R01-NB-TS (150610).docx

June 2015


 

 

 

 

 


5.9                             We thereforeconclude that the planning application proposal is acceptable in traffic and transport terms.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Transport Statement: Soho House,Brighton – Report Author:Nick Bond (nbond@ttp-consulting.co.uk)                                             10

P:\2013\1572 - Marine ParadeBrighton\Word\R01-NB-TS (150610).docx

June 2015


Figures


Notes


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0- Do not scale from this drawing
 - Drawings based on survey information provided by Digimap
 T JAMES'S STREESnsionEW IEWFn                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          :

1 toe e1

CBT JAo  s          a  i


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Revisions


 

 

 


 

 

Pi Court


J00STREEEl

ADE RA Pub t


EL02/01


 

 

2 toAMSTREEH

 

Va e ilNTSTEINEW STEINeotel

 

 

L

 

helte


 

1 3 3Royal Albiont l


 

 

 

 

 

 

 

 

 

 

 

 

 

TCB


 

 

 

 

. m

 

 

 

 

 

 

TCB


 

 

 

 

 

L                 CB


 

ea Life entre

under


 

 

 

 

 

 

 

 

 

 

 

 

DRAFT


15.

 

 

 

Sea Life Centre under


 

 

 

 

 

 

 

 

 

 

 

 

 

 

Mean High WaterAquarium Station


 

 

 

 

 

 

 

 

Shelt r

 

 

 

Shelte


 

 

 

 

 

 

 

 

.4Shelte


 

 

 

l

ub ta

 

 

toB A

*                                               F

 

 

 

1 .


 

 

 

 

 

 

 

 

 

 

 

 

9.61

 

 

 

helter


 


 

ttyShingle

 

 

 

 

 

 

ShingleSand


 

EsplanadGroHotel


Project

BRIGHTON MADEIRA DRIVE

Client

SOHO HOUSE


 


 

 

 

 

 

 

Groyne


ShingleShingle


 

 

 

SandShingl


DrawingTitle

Site Plan


 

 


 

 

Mean Low WaterSandMean High WaterN

 

0       10m


 

 

 

 

 

 

Shingle

 

 

 

Mean Low Water100m


Scale

1:1250 @ A1

 

DrawingNumber

12076 / MBA/ 001

Revision

P


Date Created

06.05.15

 

 

 

Revision Date

-


 


Drawn By

GF


CheckedBy

ZJ


Do not scale from drawing, all dims to be checkedon site. Report omissionsand discreptancies to the architectimmediately

 

 

 

 

 

 

 

 

 

 

 

SOHO HOUSE GROUP

 

Michaelis Boyd Associates108 Palace Gardens Terrace LondonW8 4RT

 

44 20 7221 1237

mail@michaelisboyd.com michaelisboyd.com


APPENDIX A

Existing LayoutPlans


Notes

Notes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


Revisions


 


 


 


 


 


SECTION 1


 


 


 


 


 


 


 

Project

BRIGHTON MADEIRA DRIVE


Client

SOHO HOUSE


DrawingTitle

Lower Level ExistingPlan (UNITS 2-5)

 


Scale

1:200 @ A1


Date Created

16.04.15


 

 


 

 

 

 

 

 

 

 

 

SOUTH ELEVATION FROM MADEIRA DRIVE

 

 

0                              5                             10                           15


 

 

 

 

 

 

 

 

 

 

 

 

 

 

20m


 

 

 

 

 

 

 

 

 

 

SECTION 1


DrawingNumber

12076/ SHG/ 010

Revision

P

 

Drawn By

TG


 

 

Revision Date

-

 

CheckedBy

-


Do not scale from drawing, all dims to be checked on site. Report omissions and discreptancies to the architectimmediately


 

 

 

 

 

 

 

 

 

 

SOHO HOUSE GROUP

 

Michaelis Boyd Associates108 Palace Gardens Terrace LondonW8 4RT

 

44 20 7221 1237

mail@michaelisboyd.com michaelisboyd.com


Notes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

 

NORTH ELEVATION


Revisions


 

 

 

 

A                                                                                    B

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Project

BRIGHTON MADEIRA DRIVE

 

Client

SOHO HOUSE

 

DrawingTitle

Existing Lower Tier Plan (UNIT 6-8)

 


 

 

 

 

 

 

 

SOUTH ELEVATION FROM MADEIRA DRIVE


 

 

 

WEST ELEVATION 2


 

 

 

WEST         A                                                                                                                                                                                             B

ELEVATION 1


Scale

1:200 @ A1

 

DrawingNumber

12076/ MBA/ 010


Date Created

06.05.15


 

 

 

0                                                             5                                                           10                                                           15                                                        20m


Revision

P


Revision Date

-


 


DrawnBy

GF


CheckedBy

ZJ


Do not scale from drawing, all dims to be checkedon site. Report omissionsand discreptancies to the architectimmediately

 

 

 

 

 

 

 

 

 

 

 

SOHO HOUSE GROUP

 

Michaelis Boyd Associates108 Palace Gardens Terrace LondonW8 4RT

 

44 20 7221 1237

mail@michaelisboyd.com michaelisboyd.com


Notes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Revisions

 

NORTH ELEVATION

 

 

 

 

A                                                                                                 B

 

 

STN9 E=506.346 N=536.601 H=56.541

 

 

 

 

 

 

STN8 E=546.362 N=532.613 H=57.479

 

 

 

 

 

 

 

STN7 E=576.829 N=527.266 H=58.140

 

 

 

 

 

 


 

 

 

 

 

STN6 E=605.343 N=518.068 H=58.639


Project

BRIGHTON MADEIRA DRIVE


 

Client

SOHO HOUSE

 

DrawingTitle

Existing Upper Tier Plan (UNIT 6-8)

 


Scale

1:200 @ A1


Date Created

06.05.15


 


 

 

 

 

SOUTH ELEVATION FROM MADEIRA DRIVE

 

0


 

WEST ELEVATION 2

 

 

 

5                                                            10                                                          15


 

WEST            A                                                                                                                                                                                           B        

ELEVATION 1

 

 

 

20m


Drawing Number

12076/ MBA/ 011

Revision

P


 

 

RevisionDate

-


 


DrawnBy

GF


CheckedBy

ZJ


Do not scale from drawing, all dims to be checkedon site. Report omissionsand discreptancies to the architectimmediately

 

 

 

 

 

 

 

 

 

 

 

SOHO HOUSE GROUP

 

Michaelis Boyd Associates108 Palace Gardens Terrace LondonW8 4RT

 

44 20 7221 1237

mail@michaelisboyd.com michaelisboyd.com


Notes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Revisions

 

NORTH ELEVATION

 

 

 

 

A                                                                                                       B

 

 

STN9 E=506.346 N=536.601 H=56.541

 

 

 

 

 

 

STN8 E=546.362 N=532.613 H=57.479

 

 

 

 

 

 

 

 

metal roof falls

 


 

 

 

 

metalroof falls


 

 

 

 

metal roof falls


 

 

 

 

 

 

 

STN7 E=576.829 N=527.266 H=58.140

 

 

 

metal roof falls

 

 

 

 

 

 


 

 

 

 

 

 

STN6E=605.343 N=518.068 H=58.639


Project

BRIGHTON MADEIRA DRIVE


 

Client

SOHO HOUSE

 

Drawing Title Existing Roof Plan (UNIT6-8)

 


Scale

1:200 @ A1


Date Created

06.05.15


 


 

 

 

 

 

SOUTH ELEVATIONFROM MADEIRA DRIVE

 

0


 

WEST ELEVATION 2

 

 

 

5                                                           10                                                           15


 

WEST            A                                                                                                                                                                                              B

ELEVATION 1

 

 

 

20m


DrawingNumber

12076/ MBA/ 012

Revision

P


 

 

Revision Date

-


 


Drawn By

GF


CheckedBy

ZJ


Do not scale from drawing, all dims to be checkedon site. Report omissionsand discreptancies to the architectimmediately

 

 

 

 

 

 

 

 

 

 

 

SOHO HOUSE GROUP

 

Michaelis Boyd Associates108 Palace Gardens Terrace LondonW8 4RT

 

44 20 7221 1237

mail@michaelisboyd.com michaelisboyd.com


APPENDIX B

Bus Map


AVBRIGHTON & HOVE77 to Devil’s Dyke

 

Brighton Area Bus Routes


17 to Horsham

33.40.40X to HaywardsHeath

270 to East Grinstead

NONDEN271.273 to Crawley


R.S.P.C.A.


 

OAROLENUAESIDE AVENUEEBY-PASS5 5A

DARRHIBBRPatcham


 

 

 

 

OADREFECTORY RD.5.5A


 

 

 

 

VIL’S DC5B.26

LSSCKIEAVE46


 

 

 

 

5B.24.26

55 .56


79 to Ditchling Beacon

 

 

 

COLLDEANANEBRIGHTON & HOVE B5B24.46COLAH46

 

DEANPLANEALRSTKHUWMA5B


STANMER PARK                  78

Stanmer Village


NORTHFIELDCRESCENT

 

5B .23

25.84

 

EUNUniversity of Sussex


23.25


 

 

 

DEARD5B .23

25.84


 

 

 

 

28 to Ringmer

29. 29B. 29X to


 

TCHAMBAY SSV.VEDO BYROA-PAH&ONGHTDAOREILM77 17.33

ID-PALLMIBRIDRLIVLE40.40X 5A

NDRD.IMW 270 56

271


 

 

 

DAROESLADIPatcham High School

WARMDE ROADWINFIELD AV.EVARD NCAWESELE5B5                            55

NENI56


56        55.56


Asda

YKE R46

L79

CUCKLRD IENHEUN46

MEREROADCA56


24

DAOROW46                            46

 

YELSELColdean

ROADCLHSUR5B


78

 

 

 

Y-PASS5B.23


25 23

 

FalmerThe Keep


5B

 

 

Amex Stadium

VILLAGE WAYFalmer


28   29  29B


29X


Tunbridge Wells


BLERISEEVIL’S DYKE ROADCMI LLOSEBRAM27 27

 

BRIGHTON&HOVEBY-PASDSENEVESIRGLENRIBRIGHTON & HOVE BY-PASSWestdene

 

LLEAYVREDEHVIILL RDMILEEVENU77


273

 

 

LLIALEHESPUEAVENNODADNOLLDOA5

AV.VAYBONRONEDRENEIDRFNOUERNEERG56


Hollingbury46  26

WILMIWNAGTO56

YNEEAVENUTHIUNLECLSNLYMINSTERAVENUEH.CTIHSEERRFCIELD46


 

 

 

 

 

.DVCLLRORLEWESMOULSECOOMB


 

A

 

 

 

 

 

EKARO23.24

25.28


24

 

 

 

DOLDEANLANENorth


25.28

EEROTDDA29. 29B 29X. 78


 

WBrighton Academy (BACA)


 

 

AYG23.25.84Brighton University (Falmer)

 

84


 

 

 

 

 

MKROADGRAHA

AVEN1 1A 55


OAHangleton

DRTHOIRVNHEILNGLETON LINK ROADANGLETONTON WAYLEVALLEY16                     5.5A


2121A

W OOD.VI ADRORGEVIEEGGGRINKOEG21B


27

DRIVEELDREDBDOORANACAWOCODB56

TONGDEANLONWHDCEEO27                                                WITHDEAN  PARK

ANELBRIVEPEACOCK LANE5B                                            26

NDENCRERFWYAIHSURRE27                                                                       55                                          46


WILD  PARK


29. 29B 29X. 78


Moulsecoomb  49

EVORDEHT49


LULEEMIRISEODSHROVERD.BIRDHAMROADMOULSECOOMBWAY1.1A

O1        55

K RA1A1A                            1

DAOCHALKY55            55


Portslade Academy and


Foredown Tower

FOX WADowns


16                                         5B

HILHHAHANGLARK5B

 

POPPA5B.16


5.5A

HARDWICKROADPOYNINGS DRIVE16.66

 

 

L14 .14C


Goldstone Valley

21.21A

ENHNG21B


21

KING21A

AVUWILLAN21B


Withdean Sports

BEUNEND VDYKERAOADALLNEVALDNALDWOODLANDDRIVERWOADOOADR2777              Complex


5.5A.17

LOND33.40.40X

ON270.271

EROADTIASTTHIDE273


79

 

DTANOERCSRAIVarndean

DSCollege                Varndean High School

 

NEITCHLINRRUVARNDEAN ROAD4626


 

BRENTWOUEDSSTOSouth Moulsecoomb


REast Moulsecoomb


 

 

 

TWOMERNT2B to Steyning


LBKENorth

DNRIVEILRBDOSouthwick              W


.EBVAOGTONGDEAN AVENUELYLEYMR.RDY-AVMile Oak 1A


Sports Centre   55


Park        6

 

6 55


 

RNO&6 55


55  66


66

 

.WESTWAYARLE5B 16 55


5.5A

14

ALCENAVENDUELDO14C


Burwash Road

CLAR16

TTENYIGNGLETON66


ENOTSDTOATANROSOROADNUENAEVHHANROADGL14C       5B 14

EVA14                           14C


21 21A


YELDRIRHOSDIVEERDGD21B


 

CEES NADOUE14 14C


 

 

 

AAHPreston


SEANONWOHARRINGTON ROADPreston Village


Dorothy

BALFOUR ROADStringer School                 56

LODER ROADROROAD79


Moulsecoomb

ROADUPLANDSROAD50


49                                                                                                                                                                              84

ORWINCHDRCOMBEWAY HDALMERROAIDDWI4849                                     48


D VETHHOLMBUSHWAYDOWNSIDETHE DROVEWAYSHOBYR-EPAHASSMODRIRYAWE2B                                                                                                      46


55          1

K ROADAO55


Hove Park

MILLADHEDRD.WNO66     (Lower)

LANEANGLETOFOR66


HOLPREGrenadier


5B

 

ORHAMill View


 

AVENUEBEEAWSVENBlatchington Mill School


14

NEVILL ROADBritish


NEVILLKVE14C


Park


Hollingdean

E TONDROVEVILLASDLOWTHERSTONDROVEPRS


Brighton University

FIOLD UURLAOEOBRYELDEAEUIVVINESUELNLIEHVAYDETHYAWROEDALE ROAD.TN .SDVEHDRE RA ACI MFRDOADHEATAHEWNROHDF48


.C19 to               19


HolmbushCentre

46


Sainsbury’s

ANNVDCESD.6.57 .66 16. 66


Hospital

DFIAMDRIVEE5                  5A


Engineerium

ENESME5B              HOVE


21             RO


Preston Manor

PRESTONPRESTON


26                50

BEXHILLRCOADEEYTOEVNTAOEWES RDDEEANWEUBADENAOBTV487946                                                                                                                                                                                                                                                                                                                              84


UPHPAEMRUPPERROADOOLEAV UShoreham

ESHOBeach                      R


9.19


EASTHILL


57               5


Hove Polyclinic                        55


Coral’s Greyhound


PARK


21A


5.5A


PARK                       5B

RPK AVRAR EPWALDEGRAVEROADACONSD VFIELDSTANFORD AVENUE5655


Lower                                                       22


2.19.59OMBRITLIDU9 to


Southlands Hospital


2  2B   59


 2B


PARK

LOCKS61

HILLRB1A


46               16

VEEANGLETORD57             66

HAN66              56

57


ORSHOREHAM RD.DOWNLAND AV.EHRD.LROAOLUENHILOHLEL.DRRHIRLPLELENDL.ROADEAOK56.57


Nevill      5A

AHospital

DR HSHODOLADAORMEARIV5ELM


PHOVE PARKEMOGEULINWLINK ROVESLLRNDAMILEP5.5A


Hove Park (Upper)

NII2B


Stadium

DAOO5B

AOLD55


21B


14

RDWAROROADROA14C

LADYSMITH RD.ENADDYGOLDSTOENFIE27


17

NOTSEVRLYN33

40

ROADSTANFO40X


MEADOWVIEWHOVE PARK RD.37B.38.38ANRRSHO MRDY37B.38

38A


Bevendean


22A

S
 A S
 ERCYELGNALWILCMIDTNEC52

 

BCRLIAM RD.RTOADNHAE.DL


WLIROADHOREHAMSMOSROSCGLANESTVEWorthing                                             9

ROADT59  to                                                  46


Southwick


46 59


D                    E                                                   2B


5 5A  56  57   59


55   56

SHILLAS5.5A


57  59


77

E UPPER DRIVECardinal


Booth


270

RDD271


R

ONAEDHCROADLondon Road


37B


Meadowview


Woodingdean

CESADHORNBYVEIRNDTNE


AROANEET.Steyning

NEY LAMMY9

H2

STO46

DMI60


TLAN1.1A.66

IMDAAONROLLR AHRALGRAFAVICTOR

.DR60


2.2B .6

46.59 .66

AROADO1


 

 

NSRacecROAoPortslade


2

HURSGEDVALIOOL16 .66


2B   56  57   59

 

2 7


 

 

eDNICKOWDursART


TREETBEARAO2.2BAldrington


5B      Brighton & Hove

Head Office

 

T2B


 

Hove


DRORADINDEN57 .5921

THE DRIVE21A

NAn21B


55 56


ADAMEHHORSDD.TH57  59


MANOR ROADNewman School


Museum


273


26                                               Brighton & Hove

ADAR RO23.24.2528.29.29B29X .38.38A46Lewes Road

48.49.7850                                                    Garage

OARHARTINGTON ROADAD79                                                     37B


 

 

 

 

KIN STRBrighton


 

ODITCHLING RISE22A

DOWRYNT22

WARRENrig2


BEROOKIBEREN2  22


LDSDOWNLAND ROADAR22A 84


22  22A  84


 

VALLEYPLINGAVENUTHE RIDGWAYADBRIAROCARDOF2            52


 

WN R222

DRROT22A


 

DAOREPLADRTKLTEWILBURY VILLASht700 to


DHS.TREEo46 60


46                                         Southwick

SOUTHWLeisure Centre

46


 

FishersgateBFishersgate


Portslade

POST. ANDREW’S RD.ANECOLEMAN AV.Health Centre


 

EUNIONRUTLAND GDNS.VILLAS16.25


25  46  49


WORDSWORGeorge Street

2B


55                                                                38                 38

BUCVIADKUICTNRGLONDONDEMNEWENGLAND37B


General Hospital


84

1.1A


52

DAORER22                                                                84

ITEELE.84


VRROOHGDEGIRVABDSRTLAND ROADW CHUN RROADRCH ROADGRATE RIGOHTOACHURCHROADHVILLEHOGARTH RD.DDTHEPortsmouth or Arundel


46 60


 

FSALBION STREETI

Southwick


49

NESAXON ROADGLEBE1 .7 .16


7                       Sussex County

DECCROMWELLAEATONRTISBURYADN STREET7Cricket Ground


 

LMEHARWRUST. ANNE’S


Seven Dials


38

 

MPL.37B


ROADOARace


Swanborough Drive

AFREHTUODSRIEVEIVRDTENSCECR2


 

ATEL TROLOINGNFINLEVELOALBIO19 to Holmbush Centre


E700


700


11A 60


 

NOAFHOROVSHYBR700


25  .49.66

WEcalling:


1 1A


Hove Museum & Art Gallery


WELL

ROAD2020                              GARDENS

21A


7 55


OA                                                                                        38

R DURZE HILLDYKEROADONTER.37A        50


21.21A

SOUTHOVER ST21B .23

QEENS PARK37B


37B

RD.AVHURSTPANK18


Hill


SACK4959 to Shoreham

HARBOUR    WAY

19


6.46


NESTER ROADWDROAHURCCHERHAWK WAYAEHTIWIW700


 60


Town Hall


21A


20

FWELIE20           21A


55

RD.VERN56. 57

R6.12.13X

20   14A .14B


Brighton

ROADROAD18


37B                                               20

REET18


21                           1.1A


Whitehawk


2

EAF ROADWNL22. 52


22.22A


AOLYDWFORTSRGOADINKADWISH ROAD59

NHove Lagoon


1 1A  6  49   60

GRAND AV.SACKVILLE GDNS.HOVE STREET25


21A

WESTERN RWSA6MONTP37A


37.37A

47.48.50

OAD81A


23

NORTH RD.’S20

ENPrince Regent         18


20.21

YA21A


21A

GWLL RD.IH21B


21

DAMANOR HILORK21A


84

ROADMLAECCOLSLE21

21A


.A55...21..2. 1.120BRAEMORE RD.19.59

B1B4ShorehamBeach


Hove

NUTHURST PL700                                               700


PalmeiraSquare


 

KINGS ROAD465.29VA77       Churchill Square


Jubilee

KIQUELibrary

NOTheatre Royal

 

RTHST.WEST ST.The Dome

Royal Pavilion


Swimming Complex

KINGSWAYEDWARD STREET0.0572.0.6Museum & Art Gallery


21B

ADRRESHFIELDROASUTHERLANDDQUEEN’S PARK


2

 

 

.DR371.1A.7

14C.23


84

LWHIKWAHMARESFIELDHITEWRoyal Sussex County Hospital

TEHROAD37

AWKF37A


EUROADStanley Deason Leisure Centre


 

 

 

 

 

West


Brighton Centre

 

77

RINEKingswest


The Lanes

KINGSOld Steine

 

ADOR77


 

 

 

 

Sea Life


37B

ST. JAMES’S ST.ONN40X.52.270

AEASTMADEIR DIRVERNROADD


37B

 

HALLDLARNO40X.270


NO37

D.R DOA37A

RON37B

MA84


 

RDNIEAST BRIGHTON PARK AND

OADWILSONFSPORTS  GROUND

Brighton & Hove


 

 

EAEASTERN ROADNROEDOvingdean


52

LAVEHTWEINOV GDEA57

EANDERDLonghill                 2

LONGHINOWSchool                   57


MAKINGS CLIFFPARADEPier


Brighton City Centre

See City Centre Enlargement of this area for details


Centre


Peter Pan Playground


Whitehawk Garage


14B  27 .47


52                                            84

Volks RailwayROEDEANROADTCR NESCEDROALLGREENWAYSRLMFAOAD57


EDRIVEEY DRIVOOADApproximate Scale


Brighton Pier


37.37A.37B

MARINEMARINEELER47.57


PA12.12A.12X

13X .14.14A

27.40X.270


14C

ILL37 .37B


14B

EDAR27


 

R7.14B


52.57


Brighton Area Bus Routes MARINE
 DRIVE
 MARINE0                1/4


1/2


3/4


1 Mile


40X.270


7.21.21A

21B .23

Brighton Marina


21.21A

21B .23.27

47.52.57


R12.12A.12X

13X.14. 14A

14B.14C


 

 

27.47

52. 57


AINSWORTH AV.G52

DRIVEREENWAYS57

 

To Saltdean


 

 

DAZEHBA2.84 to Rottingdean

57 to Saltdean


APPENDIX C

Proposed LayoutPlans


Notes

Notes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


Revisions


 


 


 


 


 


SECTION 1


 


 


 

Allocated loading baySHARED BOH


 


 

Allocated loading bayMECHANICAL


HD
 MECHANICAL


 

COLD STORAGE


 

 

RETAIL UNITSTORAGE


 

PREP


 

WASH


 

BEVERAGE STORAGE


 

STAFF CHANGING ROOM


 

+11.930


 

 


 

 

 

 

 

HD
 HD                 HD


MECHANICAL


 

 

 

 

 

BAR


 

LOG STORE


WOOD STONE OVEN


WOOD STONE OVEN


LOGSTORE


 

 

 

MIC


 

 

 

 

 

 

DISPENSE


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DISPENSE
 KITCHEN PASS


MECHANICAL

up


Project

BRIGHTON MADEIRA DRIVE


 


 

BAR
 MIC MIC
 UNIT 1


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TAKEAWAY COUNTER

 

 

UNIT 2 -

GREETER
 FISH & CHIPS RESTAURANT


 

 

 

UNIT 3 -

RETAIL WITH CAFE COUNTER


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TAKEAWAY


 

 

 

UNIT 4 -

RESTAURANT WITH TAKEAWA


 

 

 

UNIT 5 -

Y
 PIZZA RESTAURANT


 

 

 

 

 

 

 

 

 

 

STORAGE UNDER UPPER LEVEL


UNIT 6


Client

UN                                     SOHO HOUSE


DrawingTitle

Lower Level ProposedPlan (UNITS 2-5)


 

 

 

 

 

 

 

 

GREETER
 GREETER


Scale

1:200 @ A1


Date Created

16.04.15


 

 


 

 

 

 

 

 

 

 

 

 

 

 

 

RAMP 1:158.37


 

 

 

 

F.F.L +9.050


 

 

 

 

 

 

 

 

 

 

 

RAMP 1:12.5   8500mm LONG


 

 

F.F.L. +9.730


up

 

 

 

 

 

 

 

SECTION 1


F.F.L +11.930


DrawingNumber

12076/ SHG/ 100

Revision

P


 

 

Revision Date

-


SOUTH ELEVATIONFROM MADEIRA DRIVE

 

 

0                                                            5


 

 

 

 

 

 

10                                                         15                                                         20m


DrawnBy

TG


CheckedBy

-


Do not scale from drawing, all dims to be checkedon site. Report omissionsand discreptancies to the architectimmediately


 

SOHO HOUSE GROUP

 

Michaelis Boyd Associates108 Palace Gardens Terrace LondonW8 4RT

 

44 20 7221 1237

mail@michaelisboyd.com michaelisboyd.com


KEY SERVICES REQUIREMENTS                                             Notes

 

 

 

DOTTED BLUE LINES INDICATES AREAS FOR SERVICES (EXTRACT AND VENTILATION) EQUIPMENT AND AREA INCLUDES CIRCULATION/ SERVICES ACCESS REQUIRED

 


 

M.K

(1)

(2)

 

F.R

(3)

(4)

 

 

 

GR

(5)

(6)

 

G

(7)

(8)

 

M.B

(9)

(10)


Kitchen/Restaurant Ventilation Services

 

 

Main Kitchen plant (int location) 8000 w x 70000 l x 2800 h

AHU heat pump condenser (ext location) 1400 w x 2000 l x 1800 h

 

 

Fish Restaurant plant (int location) 6000 w x 7500 l x 2800 h

AHU heat pumpcondenser (ext location) 1400 w x 2000 l x 1800 h Fresh Air Ventilation Services

 

Drawing and games room

Ventilation plant (int location) 3500 w x 5000 l x 1600 h

AHU heat pump condenser (ext location) 1400 w x 2000 l x 1800 h

 

Gym

Ventilation plant (int location) 3500 w x 5000 l x 1600 h

AHU heat pump condenser (ext location) 1400 w x 2000 l x 1800 h

 

Main Bar

Ventilation plant (int location) 3500 w x 4000 l x 2600 h

AHU heat pumpcondenser (ext location) 1400 w x 2000 l x 1800 h Toilet Ventilation Services


T.S1

T.S2


Toilet system 1 (int location) 2500 w x 5000 l x 1800 h

Toilet system 2 (int location) 2500 w x 5000 l x 1800 h


 


 

 

 

(11)

(12)

(13)

(14)


Comfort Cooling Systen

 

Gym (ext location) 1400 w x 2000 l x 1800 h

Drawing Room (ext location) 1400 w x 2000 l x 1800 h Fish Restaurant (ext location) 1400 w x 2000 l x 1800 h Main Bar (ext location) 1400 w x 2000 l x 1800 h


Revisions


 

 

 

NORTH ELEVATION

 

 

 

DOTTED BLUE LINESINDICATES AREAS

FOR SERVICES (EXTRACT AND VENTILATION) EQUIPMENT AND AREA INCLUDES CIRCULATION/

SERVICES ACCESS REQUIRED                                                                                                                                                                                                               A                                                                               B

 

 

DOTTED ORANGE LINE INDICATESSMALL AREA OF FACADE TO BE DEMOLISHED AND REINSTALLED IN THE POSITIONAS SHOWN

 


 

1.4W X 2L X 1.8H AHU_KITCHEN_EXTERNAL
 M.K (2)


1.4W X 2L X 1.8H COOLING_GYM_EXTERNAL
 G (8)


1.4W X 2L X 1.8H AHU_GYM_EXTERNAL
 G (11)


 

 

 

 

3.5W X 4L X 2.6H VENTILATION_MAIN BAR_INTERNAL

M.B (9)


EXISTING RAMP TO BE REMOVED


 


 

 

EXISTING COMPOSITE STONE RAIN SCREEN CLADDING TO WEST ELEVATION TO BE REPLACEDWITH

PAINTED RENDER FINISH

 

 

 

 

OUTDOOR SEATING AREA


 

 

 

 

 

3.5W X 5L X 1.6H VENTILATION_GAMES/DRAWING_INTERNAL
    53.90


 

 

 

 

 

 

 

 

 

 

 

 

 

F.R (4)


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6W X 7.5L  X 2.8H PLANT_FISH BAR_INTERNAL


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3.5W X 5L X 1.6H VENTILATION_GYM_INTERNAL

 

G (7)


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2.5W X 5L X 1.8H VENTILATION_TOILET2_INTERNAL

T.S2

 

 

 

PLANT


 

 

 

8W X 7L X 2.8H PLANT_KITCHEN_INTERNAL

 

M.K (1)


 

STORE


 

 

 

GR (5)


 

 

 

 

 

PLANT


 

 

 

 

T.S1


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2.5W X 5L X 1.8H VENTILATION_TOILET1_INTERNAL


 

 

 

KITCHEN


 

 

 

 

 

WC/FEMALE


 

 

 

 

 

 

WC/MALE


RECONSTITUTED LIME STONE PAVING

 

 

 

DOTTED BLUE LINESINDICATES AREAS

FOR SERVICES (EXTRACT AND VENTILATION) EQUIPMENT


 

 

Project

BRIGHTON MADEIRA DRIVE


 

DOTTED ORANGE LINE INDICATESEXISTING GLAZEDOVAL

PAVILION TO BE DEMOLISHED

 

 

PROPOSED NEW PAVILLION TO 'FOOT PRINT' OF EXISTING FOR CAFE

 

 

EXISTING GLAZING TO BE REPLACED WITH NEW POWDERCOATED ALUMINIUM FRAMEDGLAZING.

 

POTENTIAL NEW


 

CAFE


 

GYM

   53.90


 

 

CHANGING


 

DISABLED


 

 

 

1.4W X 2L X 1.8H COOLING_MAIN BAR_EXTERNAL
 1.4W X 2L X 1.8H AHU_MAINBAR_EXTERNAL
 GAMES 53.90


 

 

 

 

 

 

 

BAR/DRAWING ROOM 53.90


 

RECEPTION


 

CLOAKS


 

 

GR (6) GR (12)

 

1.4W X 2L X 1.8H AHU_GAMES/DRAWING_EXTERNAL
 1.4W X 2L X 1.8H COOLING_DRAWING_EXTERNAL
 PLANT


 

 

 

 

M.B (14) M.B (10)


 

 

 

 

POTENTIAL NEW LIFT POSITION

 

 

WINDOWS TO BE FITTED WITH FROSTED GLASS TO CONCEAL SERVICES BEYOND

 

NEW GATE/ENTRY

 

EXISTING REFUSE AREA TO BE RETAINED


Client

SOHO HOUSE

Drawing Title

Proposed Lower Tier Plan (UNIT 6-8)


LIFT POSITION

 

NEW GATE/ENTRY


SOUTHELEVATION


 

 

53.90


 

OUTDOOR SEATING AREA ALONG SOUTHFACING TERRACE


Scale

1:200 @ A1


Date Created

06.05.15


EXISTING BALUSTERS AND HANDRAIL TO BE RETAINEDAND CLEANED

 

EXISTING LAMPS POSTS TO BE RETAINED

 

NEW TREES TO BE PLANTED WITHIN LIGHTWEIGHT PLANTERBOXES ALONG SOUTH FACING TERRACE


 

 

 

 

 

 

 

 

WEST


 

 

 

 

49.94


 

 

 

 

 

 

 

 

WEST           A


 

 

 

 

 

 

 

 

 

 

53.90

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B


 

49.98


 

 

EXISTING GLAZING TO BE REPLACED WITH NEW POWDER COATED ALUMINUM FRAMEDGALZING

 

EXISTING COMPOSITE STONE RAIN SCREEN CLADDING TO BE REPLACED WITH

PAINTED RENDER FINISH

 

EXISTING LISTED BALUSTRADE AND


Drawing Number

12076/ MBA/ 100

Revision

P


 

 

 

Revision Date

-


 

SOUTH ELEVATION FROM MADEIRA DRIVE


ELEVATION 2


ELEVATION1


HANDRAIL TO BE RETAINED AND CLEANED


Drawn By

MBA 19/12/2013GF/HG


CheckedBy

ZJ


 


 

 

 

0                             5                            10                            15                           20m


MADEIRA DRIVE


Do not scale from drawing, all dims to be checkedon site. Report omissionsand discreptancies to the architectimmediately


 

 

 

 

SOHO HOUSE GROUP

 

Michaelis Boyd Associates108 Palace Gardens Terrace LondonW8 4RT

 

44 20 7221 1237

mail@michaelisboyd.com michaelisboyd.com


KEY SERVICESREQUIREMENTS


Notes


 

 

 

DOTTED BLUE LINES INDICATES AREAS FOR SERVICES (EXTRACT AND VENTILATION) EQUIPMENT AND AREA INCLUDES CIRCULATION/ SERVICES ACCESS REQUIRED

 


 

M.K

(1)

(2)

 

F.R

(3)

(4)

 

 

 

GR

(5)

(6)

 

G

(7)

(8)

 

M.B

(9)

(10)


Kitchen/Restaurant Ventilation Services

 

 

Main Kitchen plant (int location) 8000 w x 70000 l x 2800 h

AHU heat pump condenser (ext location) 1400 w x 2000 l x 1800 h

 

 

Fish Restaurant plant (int location) 6000 w x 7500 l x 2800 h

AHU heat pumpcondenser (ext location) 1400 w x 2000 l x 1800 h Fresh Air Ventilation Services

 

Drawing and games room

Ventilation plant (int location) 3500 w x 5000 l x 1600 h

AHU heat pump condenser (ext location) 1400 w x 2000 l x 1800 h

 

Gym

Ventilation plant (int location) 3500 w x 5000 l x 1600 h

AHU heat pump condenser (ext location) 1400 w x 2000 l x 1800 h

 

Main Bar

Ventilation plant (int location) 3500 w x 4000 l x 2600 h

AHU heat pumpcondenser (ext location) 1400 w x 2000 l x 1800 h Toilet Ventilation Services


T.S1

T.S2


Toilet system 1 (int location) 2500 w x 5000 l x 1800 h

Toilet system 2 (int location) 2500 w x 5000 l x 1800 h


 


 

 

 

(11)

(12)

(13)

(14)


Comfort Cooling Systen

 

Gym (ext location) 1400 w x 2000 l x 1800 h

Drawing Room (ext location) 1400 w x 2000 l x 1800 h Fish Restaurant (ext location) 1400 w x 2000 l x 1800 h Main Bar (ext location) 1400 w x 2000 l x 1800 h


Revisions


 

 

 

 

 

NORTH ELEVATION

 

GRILLFLOOR COVERING FOR VENTILATION OF PLANT BELOW

MARINE PARADE(REFER TO LOWER GROUND PLAN)


 

DOTTED BLUE LINES INDICATESAREAS FOR SERVICES (EXTRACT AND VENTILATION) EQUIPMENT AND AREA INCLUDES CIRCULATION/ SERVICES ACCESS REQUIRED

 

EXISTING LISTED LAMP POSTS TOBE RETAINED


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

STN9E=506.346 N=536.601 H=56.541


 

 

56.60


 

 

 

 

 

 

 

 

 

56.88


A

 

 

 

 

57.55


 

REFER DRAWING                                                                                                          B

12076/ 402 FOR DETAILS


 

 

 

 

SMALL AREA OF RAILING TO BE REPLACED WITH GATES TO MATCH EXISTING RAILING DESIGN

BREAK BETWEEN BUILDINGS TO ALLOW FOR VIEWS TO THE SEA


 

 

DOTTED LINE INDICATES ROOF AND CANOPY ABOVE

 

 

EXISTING LISTED BALUSTERS AND HANDRAIL TO BE RETAINED AND CLEANED

 

 

 

 

 

DOTTED ORANGE LINE INDICATESEXISTING GLAZEDOVAL

PAVILION TO BE DEMOLISHED

 

 

PROPOSED NEW PAVILLION TO 'FOOT PRINT' OF EXISTING FOR CAFE

 

POTENTIAL LIFT POSITION TO PROVIDE DISABLED

TO ACCESS THROUGH THE DEVELOPMENT IN PLACE OF


 

 

 

 

 

 

 

 

53.90

 

 

 

 

 

 

 

 

 

57.57


 

 

 

 

 

 

 

F.R (13)

1.4W X 2L X 1.8H COOLING_FISH BAR_EXTERNAL

PLANT

F.R (4)

 

1.4W        X 1.8H AHU_FISH           EXTERNAL


 

 

 

 

KITCHEN

 

 

 

 

 

 

 

 

 

FISH BAR


 

 

 

WC/FEMALE


 

 

 

WC/MALE


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   57.55


 

 

 

 

 

 

 

 

 

 

STORE

 

 

 

 

 

BAR


 

 

 

 

 

 

 

 

 

 

 

 

CHANGING


 

 

 

58.20

 

 

 

 

 

 

 

 

CHANGING

 

 

 

 

 

 

 

 

 

 

 

 

POOL


 

REFER DRAWING

12076/ 401 FOR DETAILS

 

 

 

 

 

 

 

 

 

   57.55


INFILL RAILINGTO EXISTING OPENINGTO MATCHEXISTING

 

DOTTED LINE INDICATES ROOF AND CANOPY ABOVE

 

SHINGLE COVERED ROOF WITH DUNE GRASS

 

 

EXISTING LISTED RAILINGS TO BE RETAINED AND REDECORATED

 

GRILLFLOOR COVERING FOR VENTILATION OF PLANT BELOW

(REFER TO LOWER GROUND PLAN)

 

 

RECONSTITUTED LIME STONE PAVING

 

 

 

DOTTED ORANGE LINE INDIATESEXISTING CYLINDRICAL BUILDING TO BE DEMOLISHED


 

 

 

Project

BRIGHTON MADEIRA DRIVE

Client

SOHO HOUSE

DrawingTitle

Proposed Upper Tier Plan (UNIT6-8)


EXISTING NON-COMPLIANT RAMP

SOUTH ELEVATION

 

EXISTING BALUSTERS AND HANDRAIL TO BE RETAINED AND CLEANED

 

 

 

EXISTING LAMP POSTS TO BE RETAINED

 

 

 

 

 

 

SOUTH ELEVATION FROMMADEIRA DRIVE


 

 

 

 

 

 

 

 

 

 

 

 

 

 

WESTELEVATION 2


 

 

 

 

 

 

 

 

 

 

 

 

 

 

WEST           A

ELEVATION 1


 

 

 

 

 

 

MADEIRA DRIVE


 

 

 

 

53.90

 

 

 

 

 

 

 

 

 

 

 

B


 

 

 

 

 

 

1M DEEP OPEN AIR PLUNGE POOL


Scale

1:200 @ A1

 

Drawing Number

12076/ MBA/ 101

Revision

P

 

Drawn By

GF/HG


Date Created

06.05.15

 

 

 

Revision Date

-

 

Checked By

ZJ


 

 

 

 

 

 

0                              5                            10                            15                            20m


Do not scale from drawing, all dims to be checkedon site. Report omissionsand discreptancies to the architect immediately


 

 

 

SOHO HOUSE GROUP

 

Michaelis Boyd Associates108 Palace Gardens Terrace LondonW8 4RT

 

4420 7221 1237

mail@michaelisboyd.com michaelisboyd.com


KEY SERVICESREQUIREMENTS                                               Notes

 

 

 

DOTTED BLUE LINES INDICATES AREAS FOR SERVICES (EXTRACT AND VENTILATION) EQUIPMENT AND AREA INCLUDES CIRCULATION/ SERVICES ACCESS REQUIRED

 


 

M.K

(1)

(2)

 

F.R

(3)

(4)

 

 

 

GR

(5)

(6)

 

G

(7)

(8)

 

M.B

(9)

(10)


Kitchen/Restaurant Ventilation Services

 

 

Main Kitchen plant (int location) 8000 w x 70000 l x 2800 h

AHU heat pump condenser (ext location) 1400 w x 2000 l x 1800 h

 

 

Fish Restaurant plant (int location) 6000 w x 7500 l x 2800 h

AHU heat pumpcondenser (ext location) 1400 w x 2000 l x 1800 h Fresh Air Ventilation Services

 

Drawing and games room

Ventilation plant (int location) 3500 w x 5000 l x 1600 h

AHU heat pump condenser (ext location) 1400 w x 2000 l x 1800 h

 

Gym

Ventilation plant (int location) 3500 w x 5000 l x 1600 h

AHU heat pump condenser (ext location) 1400 w x 2000 l x 1800 h

 

Main Bar

Ventilation plant (int location) 3500 w x 4000 l x 2600 h

AHU heat pumpcondenser (ext location) 1400 w x 2000 l x 1800 h Toilet Ventilation Services


T.S1

T.S2


Toilet system 1 (int location) 2500 w x 5000 l x 1800 h

Toilet system 2 (int location) 2500 w x 5000 l x 1800 h


 


 

 

 

(11)

(12)

(13)

(14)


Comfort Cooling Systen

 

Gym (ext location) 1400 w x 2000 l x 1800 h

Drawing Room (ext location) 1400 w x 2000 l x 1800 h Fish Restaurant (ext location) 1400 w x 2000 l x 1800 h Main Bar (ext location) 1400 w x 2000 l x 1800 h


Revisions


 

 

 

 

NORTH ELEVATION

 

MARINE PARADEFLUSH ROOF LIGHTTO LIGHT      ABOVE STAIRS

 

 

A                                                                                     B

56.60

 


EXISTING LISTED LAMP POSTS TOBE RETAINED

 

 

FLUSH GRILLES OVER SERVICES AREA TO ALLOW VENTILATION AND

EXTRACTION SYSTEM TO BE CONCEALED


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

metal


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

metal


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

metal roof falls


 

 

 

56.88


 

 

57.55


SMALL AREA OF RAILING TO BE REPLACED WITH GATES TO MATCH EXISTING RAILING DESIGN

 

BREAK BETWEEN BUILDINGS TO ALLOW FOR VIEWS TO THE SEA


BEHIND PROPOSED EXTERNAL WALLSAND ROOF

 

 

 

SHINGLE COVERED ROOF WITH DUNE GRASS

 

ROOF LIGHT PARAPET

 

CANOPY

PROPOSED NEW PAVILLION TO 'FOOT PRINT'OF EXISTING FOR CAFE

 

OUTDOOR SEATING AREA

 

POTENTIAL LIFT POSITION TO PROVIDE DISABLED

TO ACCESS THROUGH THE DEVELOPMENT IN PLACE OF EXISTING NON-COMPLIANT


 

 

 

 

60.725


roof falls


64roof fa.lls340

 

 

metalroof falls

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

53.90

 

 

 

 

 

 

 

57.57


 

 

 

 

 

60.957


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

57.55


 

 

 

 

 

 

 

 

61.982


 

 

58.20


 

 

 

 

 

 

 

 

 

 

 

 

57.55


FLUSH ROOF LIGHT TO LIGHT ABOVE STAIRS

 

FLUSH ROOF LIGHT TO LIGHT CHANGING ROOMS BELOW

 

SHINGLE COVERED ROOF WITH DUNE GRASS

 

 

 

FLUSH GRILLES OVER SERVICES AREA TO ALLOW VENTILATION AND

EXTRACTION SYSTEM TO BE CONCEALED BEHIND PROPOSED EXTERNAL

WALLS AND ROOF

 

RECONSTITUTED LIME STONE PAVING


 

 

Project

BRIGHTON MADEIRA DRIVE

Client

SOHO HOUSE

Drawing Title Proposed Roof Plan (UNIT6-8)


RAMP


SOUTH ELEVATION


 

 

53.90


Scale

1:200 @ A1


Date Created

06.05.15


 


 

 

 

 

EXISTING LAMP POSTS TO BE RETAINED

 

 

 

 

 

SOUTH ELEVATION FROMMADEIRA DRIVE


 

 

 

 

 

 

 

 

WEST ELEVATION 2


 

 

 

 

 

 

 

 

WEST           A

ELEVATION 1


 

 

 

MADEIRA DRIVE                                 B


DrawingNumber

12076/ MBA/ 102

Revision

P

 

Drawn By

GF/HG


 

 

RevisionDate

-

 

CheckedBy

ZJ


 


 

 

 

 

0                              5                            10                            15                            20m


Do not scale from drawing, all dims to be checkedon site. Report omissionsand discreptancies to the architect immediately


 

 

 

 

SOHO HOUSE GROUP

 

Michaelis Boyd Associates108 Palace Gardens Terrace LondonW8 4RT

 

4420 7221 1237

mail@michaelisboyd.com michaelisboyd.com


APPENDIX D

Existing and Proposed Floor Areas


Notes

Notes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


Revisions


 


 


 


 


 


 


 


 


 


 


 


 


 

Project

BRIGHTON MADEIRA DRIVE


Client

SOHO HOUSE


DrawingTitle

Existing Floor Areas (UNITS 2-8)

 


Scale

-


Date Created

04.06.15


 

Drawing Number

Sketch/15/06/04/000


Revision

P

 

Drawn By

GF


Revision Date

-

 

Checked By

-


Do not scale from drawing, all dims to be checked on site. Report omissions and discreptancies to the architectimmediately


 

SOHO HOUSE GROUP

 

Michaelis Boyd Associates108 Palace Gardens Terrace LondonW8 4RT

 

44 20 7221 1237

mail@michaelisboyd.com michaelisboyd.com


Notes

Notes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


Revisions


 


 


 


 


 


 


 


 


 


 


 


 


 

Project

BRIGHTON MADEIRA DRIVE


Client

SOHO HOUSE


DrawingTitle

Proposed Floor Areas (UNITS 2-8)

 


Scale

-


Date Created

16.04.15


 

 


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

STN6 E=605.343 N=518.068 H=58.639


Drawing Number

Sketch/15/06/04/001


Revision

P

 

Drawn By

TG


Revision Date

-

 

Checked By

-


Do not scale from drawing, all dims to be checked on site. Report omissions and discreptancies to the architectimmediately


 

 

 

 

 

 

 

 

 

 

SOHO HOUSE GROUP

 

Michaelis Boyd Associates108 Palace Gardens Terrace LondonW8 4RT

 

44 20 7221 1237

mail@michaelisboyd.com michaelisboyd.com